About 122,000 results
Open links in new tab
  1. Understanding the 75°C vs 90°C column in Ampacity Table...

    May 5, 2025 · The columns indicate how much amperage is required to raise the temperature of that size conductor to that column's temperature under standardized conditions. So a 2/0 XHHW will …

  2. Branch circuits The distinction between a branch circuit and a feeder can be a source of confusion for the Code user. The first step in eliminating this confusion is to understand that the NEC defines a …

  3. EMT Fittings for Damp Locations. - Electrician Talk

    Jan 4, 2025 · Here’s 2023 NEC Same wording. I included the Enhanced Content 225.22 Raceways on Exterior Surfaces of Buildings or Other Structures. Raceways on exteriors of buildings or other …

  4. High bays hanging from rigid conduit - Electrician Talk

    Dec 4, 2024 · My AI NEC assistant tells me this is permissable. Yes, the National Electrical Code (NEC) allows luminaires (light fixtures) to be supported by a chain from a rigid conduit under specific …

  5. What are appliances and when is a disconnect required?

    Nov 8, 2025 · So appliances, as defined by the NEC, are equipment for HVAC, clothes washing, electronics, food, lighting, chemicals, or "similar purposes" which are installed as part of, or in …

  6. Table 300.5 interpretation - Electrician Talk

    Oct 16, 2023 · For a given column of Table 300.5 ("minimum cover requirements") there is a potential overlap of the various rows. The one that concerns me at present is Column 2 (IMC and RMC …

  7. Line / load same conduit - Electrician Talk

    Mar 2, 2025 · Is it against nec to run line and load in the same conduit to A fused 30 amp disconnect ? Running line and load in the same conduit is generally fine as long as it's rated for the ampacity and …

  8. Smoke Detector Circuit - Electrician Talk

    Sep 13, 2014 · I've been scouring through the NEC 2011. Can anyone post the section of the code that allows me to install residential smoke detectors on a shared circuit...

  9. NEC Requirements for Generators and Standby Power Systems Rule 220.87, Articles 445, 700, 701, and 702

  10. Continuous Load: what is "maximum current" | Electrician Talk

    From the 2023 NEC. Article 100 Definition: Continuous Load: A load where the maximum current is expected to continue for 3 hours or more. 210.20(A) Continuous and Noncontinuous Loads. "Where …